Neighborhood Beautification Project, Part 4

Day Three was a little bit cold in the shade, but cold is better than hot, especially when it comes to painting a mural. Direct sun dries out the palette and the brush, even while it is trying to do its job on a wall. 

I had a mental list of what the mural needed. The lower half wasn’t detailed.

But first, why is that rock floating in the water? That is unacceptable.
Better.
But wait – why is this middle part unfinished? The lower 1/3 will have to wait.

Finally, I began working on my day’s assignment of detailing the lower 1/3. Then, I rediscovered that the oak tree was too high to reach. Fortunately, Trail Guy stopped by to see if I needed anything, so I requested the stepping stool from my studio.

Trail Guy brought the stepping stool so I could reach the oak tree.
Then I walked home for lunch. (Is it still called lunch when it is 2 p.m.?) The air and the light were so perfect that I stopped for a photo at a neighbor’s place.
The bottom third got detailed, after I stopped finding unfinished parts all over.

It got colder in the shade, and suddenly I felt ready to go home. Because there is no deadline, no commute, and no check waiting at the end, I can return to this mural any time I have a better idea.

The light was a little low and a little flat for a good final photo. The morning light is better, but it casts too many shadows. So, the next overcast day, I’ll return in the morning for a more accurate picture.

Mural completed, building dressed up, Three Rivers neighborhood beautification project finished.

Merry Christmas, Alta Acres!

This is my final post of 2019. I’ll be back on January 6, 2020. Happy New Year, Blog Readers!

Recommended Posts